Trias Weekly Report (February 28th, 2023 –March 6th, 2023)

Trias
3 min readMar 6, 2023

--

Triathon

Community Updates

  1. The announcement about the CORE platform and the GEON token burning plan has been released.

2. The contract audit report is available now in Triathon.

Marketing & Partnerships

  1. Triathon reached strategic cooperation with Array-Protocol.

2. To celebrate our partnership with Array, we are holding a giveaway event.

Technical Updates

Regarding the CORE platform

  1. The details of Contract Detection have been optimized.

https://github.com/triathon/core/commit/dabbbc8b27340884c86381cd690a65e8cd3b8473

2. The route prefix has been unified.

https://github.com/triathon/core/commit/2f5d5840c98052735c7ed40c128b020106666f32

3. The content of the detection item has been modified.

https://github.com/triathon/core/commit/49bede869b0bbcee307854d0163f21f8ccd4a2c1

Regarding the Triathon contract

  1. The time display error on the test result has been modified.

https://github.com/triathon/website-backend/commit/dfe4c048be34a863b2292e759db7576aba2e2576

2. New verification is needed when upgrading the ship NFT.

https://github.com/triathon/website-backend/commit/c58d42664b80b88fc4154cc46dc838ed3c8c56e7

Ethanim

Community Updates

  1. New content for the website and Bastet module has been prepared.
  2. Ethanim ushers in a new milestone in the Metaverse industry, with new features launched soon.
  3. Ethanim mystery box sale will start soon. Stay tuned!

Technical Updates

  1. The navigation page has been developed.

https://github.com/EthanimNetwork/bastet/commit/f4607317a0bb6b16c80c817d8cf6dc68244e8fdc

2. Bugs of the front-end style have been fixed.

https://github.com/EthanimNetwork/bastet/commit/dc008b42227fc08c7094d680fb0d941bf4b293b0

3. The background of line spacing has been adjusted.

https://github.com/EthanimNetwork/bastet/commit/6525302dc6f891ed73b8bcc4c0d23d4277f9c42f

Tusima

Community Updates

  1. The TusimaDAO community vote on Collabland’s token airdrop distribution proposal has ended and we have submitted it to Collabland for review.

Technical Updates

1. The test environment and the production environment have been separated in the stress test.

2. Test environment configuration has been added.

3. The function of sending tokens and withdrawing tokens by the stress test robot has been optimized.

4. The reading and writing problem of environment configuration files has been optimized.

Product Development

1. The product plan for the reward points AMA trading system is being edited.

2. The structure of the technical white paper has been adjusted.

3. More public chain cooperation schemes are being edited.

--

--